From the outset there was a determination that SCIRT would establish and maintain a focus on delivering value from its activities. The Value of SCIRT report describes the process and outcomes.
Tags:performancestrategyValueLearningsBreakthrough
A suite of 31 management plans were developed under the Interim Alliance Agreement prior to the start of SCIRT, to intentionally guide the organisation. These plans were reviewed annually and updated as required. The Construction Management Plan details how SCIRT managed its construction work and ensured a consistent best practice approach across the approximately 700 projects in the rebuild programme.
Tags:managementconstructionframeworkdeliveryprogramme
A research project on the traffic and transport planning undertaken to support the rebuild of Christchurch's horizontal infrastructure by keeping traffic disruption to an acceptable level while maintaining accessibility to key amenities and limiting congestion.
Tags:traffic managementtransport planningtraffic impactroad worksnetwork capacity
Christchurch's flat and liquefaction-prone ground prompted an investigation into new methods of pipe installation.
Tags:pipedesignstorm waterwastewaterspecification
Best practice traffic management to help slow motorists travelling through roadworks.
Tags:traffic managementspeed treatmentTSLtemporary speed limitmotorist compliance
A best practice guideline for cyclists which aims to safely manage cyclists through roadwork sites.
Tags:safetytraffic managementbest practicecyclistguideline
The SCIRT pro forma was created to reduce the amount of generic and repetitive information in a Traffic Management Plan (TMP).
Tags:traffic managementpro formaTMPtraffic management plan
As an alternative to formal worksite traffic management auditing, regular site checks were implemented to focus on the more significant issues on worksites. The aim was to ensure better standards of compliance with the Code of Practice for Temporary Traffic Management (CoPTTM), and also to help upskill site traffic management staff and the industry generally.
Tags:audittraffic managementwork sitesite check
SCIRT navigated an unstable site and the discovery of rock-loving lizards to swing into action from a movable platform to deliver the "Best Public Works Project" in 2015.
Tags:innovationretaining wallstabilisationmovable platform
Christchurch's Bridge of Remembrance and Memorial Arch was one of the city's most treasured remaining historic structures left standing after earthquakes scarred the region. Its restoration required innovation and imagination.
Tags:restorationBridge of RemembranceMemorial Archwar memorialbase isolation
Christchurch was a limited user of pipe lining for underground pipe repairs but that changed after the earthquakes because of the efficiency and cost-effectiveness of this well-established type of trenchless technology.
Tags:pipetrenchlesspipe liningspiral woundcured-in-place
The construction of a new seawall on Beachville Road in Redcliffs was a demanding SCIRT project which won praise from residents and the construction industry alike.
Tags:constructionseawallripraprevetmentReno mattress
With more than 250 heritage buildings in Christchurch and Banks Peninsula demolished after the 2010 and 2011 earthquakes, preserving and protecting those heritage structures that survived took on greater significance for the people of Christchurch.
Tags:collaborationheritagerepairbridgeengineering
High groundwater levels could undermine site stability during excavation work as foundation soils failed to support a structure. Considering the site "dewatering" risk and potential solutions were all part of the design process for SCIRT.
Tags:dewateringsoilexcavationseepageartesian
A guideline to inform designers of the pipe profilometer operation, including requesting profile surveys, standards, and the assessment of the survey results.
Tags:pipeprofilometerCCTVdipdesigner guideline
SCIRT proposed that damaged gabion retaining walls could be refurbished by installing anchors through the existing baskets, secured into the ground behind them. This could provide a cost and time saving because baskets would not need to be removed or replaced and, therefore, significant volumes of excavation and backfill work could be avoided with resulting reduced construction time. In order to establish if this solution was feasible, two test anchors were installed by Rock Control in March 2014 to determine if the process was practical and was an efficient means to refurbish such walls.
Tags:retaining wallgabion basketanchoranchor testingself-drilling anchor
A suite of 31 management plans were developed under the Interim Alliance Agreement prior to the start of SCIRT, to intentionally guide the organisation. These plans were reviewed annually and updated as required. SCIRT's Design Management Plan provided the framework for effective design activities and explained how those activities were to be undertaken to meet requirements and support the achievement of rebuild objectives.
Tags:Riskdesignconceptdetailedhandover
A pipe damage assessment tool (PDAT) was developed to give a risk based prediction of pipe condition to avoid the need for a CCTV survey of every pipe in the city.
Tags:Assessmentmodellingpipedamagetool
How separate design teams from previously competing organisations came together and operated in a collaborative way. The consultancy organisations involved in SCIRT's design team were recognised for their collaboration with an ACENZ Innovate NZ Award of Excellence in 2016.
Tags:Competitioncollaborationdesign teamteam buildingworking agreement
The challenges of rebuilding underground infrastructure in liquefaction-prone Christchurch were put under the microscope in a controlled field assessment of the performance of below ground infrastructure in simulated liquefied soils.
Tags:resilienceliquefactionburied infrastructureEQCdesign standards
Asset Owner's Representatives and Technical Leads from the New Zealand Transport Agency and Christchurch City Council were co-located with the team at SCIRT's central office. There were one or two Asset Owner's Representatives and Technical Leads per asset type. Their role was to provide an Asset Owner's perspective to the rebuild of the city's infrastructure.
Tags:decision-makingdesignasset ownerco-locationtechnical advisor
SCIRT developed a Design Guideline for an Automated Flushing Siphon System to reduce the frequency of blockages in the wastewater network caused by pipe dips and flat grades.
Tags:pipedesigndipdesigner guidelineflushing siphon
To share knowledge and make the most of combined expertise, Technical Groups were formed within SCIRT during the design phase for each engineering discipline, including wastewater, land drainage, geotechnical, structures, pump stations and roadways.
Tags:collaborationinnovationnewslettertechnical solutionstandardised output
SCIRT standard details were developed to ensure a consistent approach to common design elements, and to save design time by providing a quick reference to an agreed standard design rather than creating new design drawings of the same element.
Tags:standards detailstechnical groupConstruction Standard Specification (CSS)