retaining wall

A paper describing the procedure and challenges associated with installing anchors through gabion baskets.

Size:
1.3 MB

A paper which shares the process followed for the assessment and prioritisation of the retaining walls within the Port Hills in Christchurch.

Size:
757.2 KB

A presentation to the IPWEA conference of a paper which shares the process followed for the assessment and prioritisation of the retaining walls within the Port Hills in Christchurch.

Size:
2.8 MB

A paper which outlines the observed damage to Christchurch City Council-owned retaining walls and the repair solutions developed.

Size:
1.5 MB

A paper which outlines SCIRT's approach to asset assessment, design and repair of damaged retaining walls, and presents a case study of a retaining wall rebuild, on Cunningham Terrace, Lyttelton.

Size:
910.9 KB

A magazine article which outlines the observations of engineers working on SCIRT retaining wall and ground improvement projects.

Size:
1.6 MB

A document which describes the process that SCIRT took to repair the Sumner Road retaining wall - stage 4.

Size:
657.4 KB

An award application submitted for the IPWEA Annual Excellence Awards 2016, detailing Fulton Hogan's work repairing the repair methodology for the Sumner Road retaining wall - stage 4.

Size:
1.8 MB