With the SCIRT programme involving people from hundreds of different organisations, it was key that everyone used the same terminology to avoid confusion and errors throughout design and in the preparation of construction drawings and specifications for roading related earthquake repairs.
Tags:rebuilddesignroading terminologyrepairrestoration
Popular Searches: