management plan

A plan which outlines the processes and IT applications and services required to manage the SCIRT programme. The first version of this plan was produced on 9 August 2011.

Size:
2.0 MB

A plan which outlines how SCIRT is to carry out condition investigations and analysis. The first version of this plan was produced on 1 September 2011.

Size:
848.9 KB

A plan which describes how SCIRT would manage the risks associated with rebuilding horizontal infrastructure within Christchurch's central city area. The first version of this plan was produced on 24 October 2013.

Size:
29.4 MB

A plan which documents how SCIRT is to efficiently and effectively ramp down the delivery of its work, demobilise facilities and resources and wind up the organisation.

Size:
10.9 MB

A plan which describes how SCIRT is to carry out construction works. The first version of this plan was produced on 10 August 2011.

Size:
15.5 MB

A plan which provides SCIRT with clear direction and guidelines regarding communication in the event of a crisis. The first version of this plan was produced on 1 December 2013.

Note that personal details of key personnel have been removed from this document.

Size:
29.3 MB

A plan which describes how SCIRT will carry out design work. The first version of this plan was produced on 1 September 2011.

Size:
1.1 MB

A plan which outlines the function, roles and responsibilities of SCIRT during an emergency event affecting SCIRT construction works. The first version of this plan was produced on 30 April 2012.

Note that personal details of key personnel have been removed from this document.

Size:
1.9 MB

A plan which outlines how to manage the environmental impacts that result from SCIRT works. The first version of this plan was produced on 20 July 2011.

Size:
4.5 MB

A plan which outlines how projects will be estimated to generate project Target Out-turn Costs (TOCs), and how these link into the programme TOC. The first version of this plan was produced on 29 July 2011.

Size:
3.0 MB