estimator

A document which describes the SCIRT estimates process and outcomes.

Size:
956.3 KB

Summary of an independent review of the TOC process.

Size:
451.2 KB

A plan which outlines how projects will be estimated to generate project Target Out-turn Costs (TOCs), and how these link into the programme TOC. The first version of this plan was produced on 29 July 2011.

Size:
3.0 MB