engineering

A document which describes the processes that SCIRT took when repairing some of Christchurch's heritage bridges.

Size:
881.8 KB

A guideline created for SCIRT Delivery Teams which outlines the requirements for working around heritage items.

Size:
1.5 MB

An award application for the Civil Contractors NZ Hirepool Construction Excellence Awards 2015 which details Downer's approach to repairing the Armagh Street bridge.

Size:
8.9 MB

A document which details Downer's approach to heritage management when repairing the Armagh Street bridge.

Size:
1.0 MB

A document containing photographs of SCIRT's Armagh Street bridge repairs.

Size:
791.7 KB

A report which details the archaeological monitoring carried out during the course of SCIRT project 11136, repairs to the Gloucester Street bridge.

Size:
3.0 MB

A public relations flyer which outlines the repairs undertaken on the Gloucester Street bridge.

Size:
2.9 MB

A run sheet which details who will do what at the opening of the Gloucester Street bridge.

Size:
986.8 KB

A video which describes the history of the bridge and SCIRT's repair methodology.

Size:
13.7 MB
Download:

A conference paper prepared for the 4th Australasian Engineering Heritage Conference which outlines the challenges faced by SCIRT when repairing the Armagh Bridge, Colombo Bridge and Antigua Bridge.

Size:
1.1 MB