Search
An interactive web-based platform for stakeholders to observe active and planned works to aid coordination and planning and to enable the mitigation of spatial and traffic conflicts.
At the height of the rebuild, SCIRT had 150 works crews active across Christchurch, including about 40 working at any one time within the central city.
A promotional brochure explaining the Forward Works Viewer and that the tool was a key to cost-effective and efficient project delivery in Christchurch.
A presentation created by LINZ, explaining the application and benefits of the National Forward Works Viewer.
This suite of documents provided a comprehensive programme management tool for the definition, prioritisation, design and construction of interdependent projects within a central city environment. The documents were developed and used for an intensive post-disaster rebuild but had other applications with similar operating parameters.
A diagram illustrating how the rebuild of the three waters and roading infrastructure was to be managed and coordinated with other programmes of work in the central city.
A document outlining how the rebuild of wastewater, water supply, storm water and roading infrastructure was to be managed and coordinated with other programmes of work in the central city.
A document outlining the methodology for rebuilding horizontal infrastructure in the central city, covering wastewater (local reticulation and trunk), wastewater pump stations, storm water (local reticulation and trunk), potable water, roads, and bridges.
A document created in 2011, demonstrating the design parameters for the rebuild of wastewater, storm water, water supply and roading in the central city.
A copy of the plan developed in 2011 to facilitate a collaborative approach between all stakeholders and minimise the impact on the traffic network, because of the extensive repair works necessary to repair vertical and horizontal infrastructure.
A copy of the plan, developed in 2011, outlining the communication and community engagement that supported SCIRT's central city programme and kept Christchurch residents informed about this work.









